The reform agenda for power engineers in the Yakutia regions from July 18 to July 29 – YSIA

Most of the repair work is carried out during the day working days

Specialists in the central and western electrical networks carry out daily work on connecting new subscribers to the electrical networks and consistent repair work at electrical network facilities, which is impossible without temporary restrictions on power supply. For the convenience of consumers, the main part of the repair work is carried out during working days during the day, during which electricity consumption is significantly reduced.

Temporary power supply restrictions will be implemented in Yakutsk and a number of regions according to the following schedule:

Yakutsk
July 18:

09:00 – 12:00 – TSS “Green Valley”, Syrdyk 2-25, Dachnaya 1-56 / 8, Pokryshkina 2-6, Vodopyanov 2, 8, Pilotov 28, 31 –

09:30-11:30 – st. Avtodorozhnaya 18, 18/2, 19/1, 20G – transformer maintenance;

14:00 – 16:00 – Street. Levanevsky 1, 1/1, 3, 4, 6, 8, 10, 15, 20/1, 24/1, 32, 17, 5, 9, 14, 18, 22, 26, 3 squares. 1 (h / house), Bestuzhev-Marlinsky 56/1 (from the railway station a sewage pumping station is provided), 48/1, 36/1, 36/2, 54, 42, 46, 48, 48/1 , 54, 56, 33/2, 60, 62, 27/2, 52/2, 42, st. V. Saw 1, 2/1, 2/4, 2/5, 4, 8, 29, 21, 24, 30/2, 32, 10, 4/1, 32/1, 35, 39, 43, 49 , 30, 32, 22, st. P. Osipenko 3, 3/2, 7, 9a, 11, 12, 15, 17, 16/2, per. Olminsky 2, per. Stojanovica 1, 2, 3, 5, 6, 7, 8, 10, 19, 20, 25, 17a, st. Stoyanovicha 24, 11, 13, 19 – transformer maintenance.

09: 00-20: 00 – Vilyuisky track 9-23 km – scheduled examination of URZA;

13:00 – 17:00 – Sergelyakh DSK “Druzhba-2” 40, Sergelyakhskoye highway 7 km 20/5, 32/5, Ostrovnaya 10/1, SOT Poultry Farm 21D, Poultry Farm 19, Longinova 19-36, N- Karnaya 20/4, trans. 9 Dear – It serves to deliver technology to consumers.

14:00 – 16:00 – Street. Levanevsky 1-32, B. Marlinsky 33/2-62, V. Manchaary 1-49, P. Osipenko 3-17, per. Stoyanovicha 1-25 each. Olminsky 2 – Transformer maintenance.

July 18, 20, 22, 25 and 27:

09: 00-16: 00 – st. Krasnoyarova 10-22, Chkalov 31-41, 52, Chernyshevsky 52/7, 56, 56/2, Baikalova 1/1, 5-17, 25, Lenin 63 – overhaul of overhead lines;

July 22:

09: 00-20: 00 – 15 km Vilyuysky track – scheduled examination of URZA.

July 25:

09: 00-20: 00 – Vilyuysky track 13-16 km – scheduled examination of URZA.

25 and 27 July:

09:00 – 17:00 – Orzhonikidze 33, 33/1, 35, 37, 37/2, 39, 39/1, 43, 41, 45/1, 43/2, Lenina 34, 36, 34/1, 38, 32, 40, Kirov 13 – equipment repair;

July 26:

09:00 – 17:00 – Poultry Farm 8, 9, 10, 10/1, 10v, 12, 12/2, 12/4, 14, Nagornaya 10, Student 4, 6, 14, 11, 13, PTF Tuymada 38/1 – equipment repair;

09: 00-20: 00 – Vilyuysky track 13-15 km – scheduled examination of URZA.

July 27:

09: 00-20: 00 – Vilyuysky track 16 km – scheduled examination of URZA.

Verkhenviliwsky district
July 21:

10:00-18:00 – Botulu, Surguluk, account. Keteradeh – current fix for SS 35/10 kV Botulu.

July 22:

10:00 – 16:00 – Botulu, Surguluk, account. Keteradeh – current fix for SS 35/10 kV Botulu.

Veliwski district
July 18:

From 16:00 to 18:00 – Vilyusk (small district Bess, Arbolite, Ecology, Pechanaya, Kondakov, Yubilinaya, Oyonsky, P. Alekseev, Vostochnaya, Kondakov, Cherkanov, I. Popov, Kulakovsky, Shakhov, Okuimov, Beshev , International, Partisan Semenov, Khomostakhskaya, Chapaeva 45-121, Ordzhonikidze, Kalandarishvili, Mark Zhirkov, Pushkin, Pushkin Lane 1, 2, Partisan Semenov Lane, Amosov, Lenin 32-126, Lesnaya 1-8, Yaroslavskogo 38-104, InternationalNaya 1-22, P. Semenova 1-16, Chapaeva 1-48, Central District Hospital: surgery, treatment, maternity hospital, resuscitation, dairy products, VSSh-1, Erchim Sports Complex, Orphanage, Ulcer Department, Ministry of Emergency Situations, Rosselkhozbank, VSOSH-2, gymnasium, MD: “Dolguncha”, “Modun”, “Tabun”, “Nugget”, “Good”, “Kiin”, “Tokhto-Tokhto”, “Talba”, “Bayilyat”, Autoworld, Toyota, Egelge, Skif, Cinema, Bakery, Polyclinic, Myasnoy Dvor, post office, Lana market, CSN, Cityim, City Line, District MPMK, TUSM, Ecology) – URZA verification;

18: 00-20: 00 – Velyusk (YATEK gas station, Zausaev car service, traffic police, youth boarding school, mik. Molodyozhny, TV tower, Lenina Street., Gorky, Pionerskaya, Lenina 1-39, Yaroslavsky 1-22, Oktyabrskaya 1-22, Mira 1-22, Military-Industrial Complex, World and Federal Courts, Church, Energosbyt, Military Recruitment Office, Prosecutor’s Office, Ssberbank, Housing and Communal Services, Lenagaz 04, VSH-3, City Administration, DK “Algys ”, Security, Vostochny Expressbank, canteen, library, post office, oil depot) – URZA check;

20:00-22:00 – Vilyuisk (Sineglazovaya, Molodyozhnaya, Pine, Lesnaya, Yakutskaya, Vostochnaya, International 40-47, Kulakovskogo 20-47, Kulakovskogo lane 9-19, Gagarina 26-45, Shakhova 11-18, District MMC , DRSU, tax, veterinary, mn “Dorozhny”, AZS-STNG, AZS-Energy, AZS-Tuymaada, airport, AGRS, BTI, tuberculosis dispensary, infection department, business incubator) – URZA examination.

July 19:

14: 00-16: 00 – Sosnovka, Starovatova, Tosu, Balagachcha, Kirova, Satagai – URZA examination;

16:00 – 18:00 – Khampa, Tasagar, Ebya, Tympy, Tea – URZA examination.

Kobaya region
July 19:

16: 00-18: 00 – Saylek, Arilakh, Miskh, Baghadia – Shek Urza.

Lenski District
July 18-19:

09:30 – 17:30 – North Niuya, Chamcha, Orto Nahara – Preventive testing of substation equipment.

July 18-22:

From 14:00 to 18:00 – PSSRZ – replacement of struts.

July 21:

09:30-19:00 – Chamcha, Orto-Nakhara – URZA maintenance;

20:00-22:00 – road, north of Niuya, Chamcha, Orto by day – for operational switching time to restore normal operating scheme.

July 22:

09:30-19:00 North Noya – Urza Maintenance.

July 27:

10:00 – 13:00 – Road, North Niuya, Chamcha, Orto by day – Removal of bushes.

MEGINO-KANGALASSKY DISTRICT
July 18:

10:00-15:00 – Nizhny Bastyakh settlement, small forest area, hospital, Appalach, BATP, ETUS, ulus administration – urgent work on the upper line.

Merninsky District
July 18:

09:00-17:30 – Chernyshevsky (KOTs, RMM, shops “555”, “Troika”, “Bread”, “Spark”, “Culinary”, “Bakery”) – transformer maintenance.

July 19:

09:00 – 17:30 – Chernyshevsky (Antuziyastov 10, 11, 13, 15, Mira 2, 4, 6, 7, 8, 9, 10, 12, 14, Snezhnaya 2, 4, 6, 8, 9) – work in PTS;

From 14:00 to 17:00 – dawn (Ivanova 16, builders 12, Lesnaya 6, 12, 68) – repair of keys.

July 20:

09:00 – 17:00 – Mirny (Lenina 38, 40, 42, 44, 34b, 40 years old October 38b, 44a, 38a, 40a, 42a, 46a, 38, 40, 42, 44, 46, 50) – contact consumers.

From 21 to 22 July:

09: 00-17: 30 – Chernyshevsky (16, 18, 20, 22, 24 Kosmonavtov Street) – work in the PTS.

July 26:

11: 00-20: 00 – Tass – Yuryakh – Transformer repair.

Namsky District
July 18

23:00-24:00 – sec. Namtsy, Iskra, Tastakh, Salban, Appany, Gr.Bereg, Kysyl village, Betyuntsy, Moduttsy, Khatyryk, Maimaga, Tyubya – operational switch.

July 22:

13: 00-17: 00 – from. Khmaskh I – scheduled work on the equipment of the substation.

July 25:

10:00 to 15:00 – p.m. Kobyakontsy, Arbyntsy, Frunze – work in the security zone of the overhead line.

July 26:

09: 00-18: 00 – from. Kobyakontsy, Arbyntsy, Frunze – work in the security zone of overhead lines;

10:00 to 17:00 – p.m. Yedeytsy, Letniki Yedeytsy, Letniki Khomustakh, Cell Towers, p. Partizan, Nikoltsy, Khamagata – scheduled work on the equipment of the substation.

July 27:

09:00 – 18:00 – from .Arbyntsy, Kobyakontsy, Frunze – work in the security zone of overhead lines;

09:30 – 17:00 – sec. Namtsi is part of the street. Ammosova, Salbanskaya, Lenina, Sovetskaya, Tallan-Bure, Oktyabrskaya, K.Vinokurov, Ch.Vinokurov, I.Vinokurov, St.Platonova, Anniversary, Rural, Reshetnikova, Kondinsky, 30 years of Victory, Northern, Polar, North Kolkhoznaya, Quarter, Primary, Everestova, Manshari, Youth, Mimach, Novaya, Sportivni Pass, Kunda Crest, Dadar Site, Traffic Police, Dispensary, Bus Station, Narsod, Editorial Office, Village Administration, Veterinary Medicine, Music School, Prosecutor’s Office, Station Weather, Post Office, Rostelecom, NKTE, Rosselkhozbank, Treasury, NSSh-1, Gymnasium, head school, bailiff, Lenagaz, Cinema, Hansa, store, Library, Ozerny Quarter with. Appany, Tastakh, Salbantsy – scheduled work on the equipment of the substation.

28-29 July:

09:00 – 13:00 – sec. 2 five. Taragay Bes, Voin and Yuner divisions – scheduled work on substation equipment.

Nurebinsky district
July 18:

09:30-12:30 – Antonovka (bypass, Gabysheva, Pakhumova, Nikolaev, Barkovaya) – Begd’eleele KTP maintenance;

From 14:30 to 17:30 – Antonovka (Nikolaev Street) – maintenance of the Uraslag River TP.

July 19:

09:30 – 12:30 – Antonovka (ALROSA Street, Solnechnaya, 65 years of Victory) – maintenance of PTS “ALROSA Lappirian”;

From 14:30 to 17:30 – Nerpa (Energetik square 71, 73, 75) – Arktika TP maintenance.

July 20:

09:30 – 12:30 – Nyurba (Vodnikova Street, Zarechnaya) – maintenance of the KTP “Old Bath”;

14:30 – 17:30 – Antonovka (Ipodromnaya Street, Pushkina, Sosnovaya, 50 years of Victory) – Ippodromnaya TP maintenance.

July 21:

09:30 – 17:30 – Antonovka (Lugovaya, Severnaya, Polyarnaya Street) – maintenance of TP “Sawmill Kysyl”;

10:00-18:00 – March, Zarkhan, Marka, Kirov, Akana, Yanksit, Chkalov, Eddie – overhaul.

July 22:

09:30-12:30 – Antonovka (Kencheeri Street) – maintenance of the KTP “Kencheeri”;

14:30 – 17:30 – Antonovka (Antonovskaya Street) – Antonovskaya PTS maintenance.

Oliminsky district
July 21:

11:00 – 16:00 – Olekminsky (Kalandarashvili) – replacement of struts.

Suntar neighborhood
July 18-19:

09: 00-13: 00 and 14: 00-17: 00 – Serdanga (partially) – equipment maintenance.

July 19:

10:00 – 16:00 – Elgyai, Kundyaya, Khoro, Toloon, Sheya, Tyubai-Zharkhan, Tyubai, Ygyatta, Toybokhoy, Usun-Kyuel, Mar-Kyuel, Zharkhan, Allaga, Krestyakh, Kokunu, Tenkya, Nahara, Vilyuchan – current equipment repair;

10:30-15:00 – Taipei – drilling and installation of attachments.

July 20:

10:00-12:30 – Centar (partially) – Replacing the transformer in the KTP.

July 20-21:

10:00-17:00 – Suntar (partial) – replacement of overhead line struts.

July 25:

10:00-18:00 – God – earthworks.

26-27 July:

10:00 to 17:00 – Zarkhan – drilling and installation of attachments.

26-28 July:

11:00-18:00 – Kutana, Kyukiai – Replacing the foundation at the transformer substation, installing the piling.

July 27:

From 14:00 to 16:00 – Crosses, Nahar, Filiushan, Kokono, Tinkya – A. the exams.

16: 00-18: 00 – Osun Keel, Zarkhan, Altapa, Mar Kell – A. the exams.

Tatinsky District
July 19:

09: 00-17: 00 – c. Tuora-Kyuel, Debdirge, Bayaga, Volba, Ust-Tatta, Khara-Aldan, Kharbalakh, Chimnai, Chychymakh, Cherkekh, Kyyy – Substation equipment maintenance.

July 20:

09: 00-17: 00 – from. Shark, p. Kyyy – current overhaul of substation equipment.

Thompon area:
July 19:

09: 00-17: 00 – from. Krest-Khaldzhay, Keskil, Drummer, Ary-Tolon, Megino-Aldan – equipment maintenance.

July 22:

00: 00-01: 00 – Khandyga settlement – short-term restriction during operational switching;

00: 00-06: 00 – Khandyga settlement – maintenance of substation equipment.

Khangalas District
July 18, July 19:

09:00 – 17:00 – Pokrovsk region, small Kiel-Pastakh – work in the security zone of overhead lines.

July 18:

16:40-17:00 – p. Oktemtsy, Chapaevo, Ulakh An, Tekhtyur – operational switching to a 110 kV substation Oktemtsy

July 18-22:

09: 00-17: 00 – from. Red Stream Street. Pokatilova – work in the security zone of overhead lines;

09: 00-17: 00 – Ulakhan Ann Street. Samsonova – work in the security zone of the overhead line, installation of a SIP wire;

July 19:

10:00-11:00 – p. Tit Ebe, Kerdem, Krasny Ruchey, Kachikatsy, Hotochchu – work in the protected area of ​​the upper line.

July 21:

11: 00-18: 00 – from. Tit Ebe, Kerdem, Krasny Ruchey, Kachikatsy, Hotochchu – work in the protected area of ​​the upper line.

25-26 July:

10:00 to 17:00 – p.m. Belgoniakhte Street. Partly Soviet, school, boiler house – replacement of the TS-10 / 0.4 kV enterprise “New School”.

10:00 to 18:00 – from. Bestyakh, Legleger (in part), Charan – unscheduled work at the LTP substation with a voltage of 35 kV.

July 26, July 28:

09: 00-17: 00 – Pokrovsk, St. Lugovaya, Stadionnaya – work in the security zone of overhead lines;

July 28:

10:00 to 17:00 – p.m. Tekhtyur, Oktemtsy, Chapaevo, Ulakhan An – scheduled work at the substation;

14:00 – 16:00 – Mahsooqloukh village (partially) – Urgent work on the upper line.

The schedule is subject to change.

.

Leave a Comment